Trenchless pipelaying, an ingenious technique

Mechanised laying of a drinking water supply network

Over 2 km of DN125 Polybleu PE100 BB pipes , in long-length format packaged on drums, were delivered to Brittany and laid using a trenching machine.

Mechanised laying speeds up the installation work, which takes just a few hours, reduces the number of machines require on-site, and cuts down the total site time.

Find out more about the trenching machine pipelaying technique:  Pay a visit to our technical blog.