Here are a few case studies of large-scale projects that used Elydan geotextiles.
At the grade crossings in this project, cantilevered walls up to 6 m high were constructed to raise the track and contain the embankments without exceeding the width of the right-of-way granted. Each level crossing required 100 ml of wall and a drainage system made of granular material and geotextile to divert rainwater that was seeping into the embankments. Procuring and installing the filter gravel slowed down the work, with each crossing’s backfilling taking between 4 and 6 weeks.
We replaced the gravel and geotextile drainage system with our ISOCOR 10E drainage geocomposite, which has a higher flow capacity than the 25 cm of gravel originally specified in the project.
The use of ISOCOR 10E resulted in significant time savings during controlled backfilling by eliminating the need for on-site preparation of granular materials.
• Overall reduction in construction costs
And by shortening the timeline from 5 weeks of compacted backfill to just 2 weeks of construction work.
Tren Maya Project
Civil Engineering Division
Client TDM México
Location Mexico
Solution ISOCOR 10E
Quantity 101,315 m²
In Lima, Peru’s capital city, located on the Pacific coast at an elevation of 150 meters, a new landfill has been established, incorporating Elydan drainage geocomposites.
Séché Pérou, a global player in waste management, has been relying on Elydan since 2018 to optimize drainage at the bottoms of its storage bins. The solution implemented was the Solpac L (NSL) drainage geocomposite, which replaces the traditional, costly combination of geotextiles and granular materials.
Traditionally, the waste treatment containment system consists of a combination of materials, such as a watertight bentonite clay barrier, an HDPE geomembrane, a protective geotextile, and a granular drainage layer up to 50 cm thick, on top of which the waste is deposited. Although effective, this method involves high capital and operating costs, a lengthy installation period, and operational risk.
• Lower total cost of the drainage system
Installing the NSL is faster and simpler than installing a gravel-based drainage system. It also results in savings on labor and equipment.
• Reduced risk of accidents
Due to the reduced need for mechanical and human intervention on the job site
Planta Chilca Project
Environmental Product Line
Client: Séché Group Perú
Location: Lima, Perú
Solution: Solpac L Geomembrane
Quantity: 98,000 m²
The Akouédo landfill had been Abidjan’s only waste disposal site since 1965. Mountains of waste cover an area of 100 hectares near the village of Akouédo, in the municipality of Cocody, which is part of the Abidjan metropolitan area.
Harmful gases, foul odors, and health hazards affect residents living near Akouédo.
The waste was shaped, compacted, and reshaped, then covered with soil and a waterproof membrane that traps harmful gases.
The Solpac geomembrane acts as a barrier that drains infiltrating water, preventing it from reaching the lower layers and avoiding saturation and overloading, thereby improving the durability of the waterproofing barrier and reducing construction and maintenance costs.
Infiltration could contaminate the area, which, in the case of Akouédo, posed a significant risk.
• Reduced risk of accidents
Good overlap between the rolls, thanks to the honeycomb shape. These honeycombs also provide good slope stability, preventing landslides.
• Environmental protection.
Effective drainage, with high long-term flow capacity.
CET Rehabilitation Project in AKOUEDO
Environmental Line
Client PFO AFRIQUE
Location Ivory Coast
Solution Solpac 8 Geomembrane
Quantity 900,000 m²
In concrete-lined tunnels, one of the most significant challenges is controlling water seepage from the rock mass. This seepage generates hydrostatic pressure on the PVC geomembrane used as a waterproofing barrier between the primary concrete and the final lining. If not properly drained, this pressure can compromise the waterproofing and cause moisture to accumulate behind the membrane, thereby affecting the durability of the waterproofing.
Two geocomposites with different hydraulic capacities were used: Isocor 8 and Isocor 10. The selection of each was based on the specific containment conditions and the expected water flow rate in each section of the tunnel. This strategy ensured the continuous and complete drainage of water in contact with the structure, thereby eliminating hydrostatic pressure on the PVC geomembrane.
• More effective waterproofing system
. The uniform drainage of infiltrated water reduces the stress on the PVC geomembrane, which improves performance and extends the service life of the waterproofing system.
Villavicencio Project
Civil Engineering Division
Client: Vinci Coatings
Location: Colombia
Solution: Isocor 8 and 10
When water seeps into the inner layers of a road, it weakens the soil that makes up those layers, causing them to lose their firmness and making them more prone to deformation. This can lead to potholes, cracks, and other damage to the road surface. All of this not only makes the road less safe and less comfortable to drive on, but also increases maintenance costs and shortens its lifespan.
To prevent lateral seepage, we used our RoadDrain solution. This drainage geocomposite acts as a barrier that quickly channels and removes water from the sides, preventing it from reaching the road’s base and subgrade layers. This solution helps prevent soil saturation beneath the pavement, thereby improving its durability and reducing construction and maintenance costs.
• Savings in construction costs
By eliminating the use of gravel
• Extended project lifespan
By preventing moisture from seeping under the road
Project: A28 Highway
Civil Engineering Sector
Client: Lane
Location: France
Solution: RoadDrain
Quantity: 22,416 ml
Find your contact for all your drainage projects with our Elydan map and directory
PE100: A sustainable revolution in the pipe industry In a world where sustainability and energy efficiency have become top priorities, the pipe industry is undergoing a veritable revolution thanks to PE100.
Case study: Drainage at Mexico City Airport Elydan participated in the construction of one of the largest airports in the Americas. Mexico City International Airport in figures: ▪ $10 billion